Laserfiche WebLink
PERMIT#:M-1977-493 <br /> INSPECTOR'S INITIALS:ACY <br /> INSPECTION DATE:December 16,2021 <br /> then pumped back to the mill water tank or process water tank. The Robinson Pump House is well kept,no <br /> leaks on pumps or other spills were apparent. The abandoned pump house remains in place but has safety <br /> signage in place, this building was not inspected. <br /> 4 Dam <br /> The face of 4 Dam appeared to be in good condition.No staining or other visual indicators of a problem were <br /> observed. Seepage water is collected from the Eagle Park Reservoir in a collection pond below the 4 Dam. The <br /> collection pond appeared to be completely frozen over. The Collection Pond water enters the 4 Dam Pump <br /> station where the water is sent back to Robinson Lake. The Division inspected the inside of the 4 Dam Pump <br /> Station. The building was well kept, no leaks on pumps or other spills were apparent. <br /> No Problems or Possible Violations were identified during this inspection. <br /> Responses to this inspection report should be directed to: Amy Yeldell at the Division of Reclamation, Mining <br /> and Safety, 1313 Sherman St., Room 215, Denver, CO 80203. Direct contact can be made by phone at 303-866- <br /> 3567 Ext 8183 or via email at amy.yeldell@state.co.us <br /> Inspection Contact Address <br /> Alex Ungers <br /> Climax Molybdenum Company <br /> Highway 91, Fremont Pass <br /> Climax, CO 80429 <br /> Enclosure <br /> CC: <br /> Travis Marshall, Senior EPS, Grand Junction DRMS <br /> Page 3 of 7 <br />