Laserfiche WebLink
Page 1 of 2 <br /> EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Initial Mobilization <br /> Site: Piceance Pit Permit Action: S03 Permit/Job#: M2001077 <br /> PROJECT IDENTIFICATION <br /> Task#: 04A State: Colorado Abbreviation: None <br /> Date: 12/22/2021 County: Rio Blanco Filename: M077-04a <br /> User: ACY <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT <br /> TRAILER(25T,50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons <br /> Ownership Cost/Hour: $21.28 $37.94 $47.67 <br /> Operating Cost/Hour: $26.55 $50.48 $56.21 <br /> Operator Cost/Hour: $20.54 $20.54 $20.54 <br /> Helper Cost/Hour: $0.00 $23.53 $23.53 <br /> Total Unit Cost/Hour: $68.37 $132.49 $147.95 <br /> NON ROADABLE EQUIPMENT, <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/uni Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> (TONS) t fleet <br /> CatD8T-8SU 53.08 $112.65 $147.95 1 $260.60 $147.95 $250.00 <br /> Cat637G 57.28 $218.34 $147.95 1 $366.29 $147.95 $250.00 <br /> Drill/Broadcast 25.00 $7.98 $68.37 1 $76.35 $68.37 $250.00 <br /> Seeder with <br /> Tractor <br /> Subtotals: 1 $703.24 $364.27 $750.00 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/fleet Cost/hr/fleet <br /> Flatbed Truck,4x2,30K GVW $85.26 1 $85.26 $85.26 <br /> Subtotals: $85.26 $85.26 <br /> CIRCES Cost Estimating Software <br />