My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-12-22_REVISION - M2009035
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2009035
>
2021-12-22_REVISION - M2009035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2021 10:59:33 AM
Creation date
12/22/2021 10:49:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009035
IBM Index Class Name
Revision
Doc Date
12/22/2021
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Andy Azacarraga - M.A. Concrete Construction, Inc.
Type & Sequence
SI1
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task#03A Page 2 of 2 <br /> Cycle Time: <br /> Scraper Loading Time: 0.80 Minutes <br /> Maneuver and Spread Time: 0.60 Minutes <br /> Job Condition Correction: Site Altitude:4620 feet <br /> Scraper Push Dozer Source <br /> Altitude Ad': 1.000 NA (CAT HB) <br /> Job Efficiency: 0.830 NA (CAT HB) <br /> Net Correction: 0.830 NA <br /> Travel Time: <br /> Road Condition: Rutted dirt,little maintenance,no water,2"tire penetration 5.0 <br /> Haul Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity(fpm) Travel Time <br /> (%) (%) (0/0 (min) <br /> 1 500.00 0.00 5.00 5.00 1867 0.40 <br /> Haul Time: 0.40 minutes <br /> Return Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity(fpm) Travel Time <br /> (%) (%) (°/u) (min) <br /> 1 500.00 0.00 5.00 5.00 2795 0.34 <br /> Return Time: 0.34 minutes <br /> Total Scraper team cycle time: 2.14 minutes <br /> Adjusted for job conditions: 558.50 LCY/Hour <br /> Selected Number of Scrapers: 1 Scraper(s) <br /> Adjusted single scraper team(unit)hourly production: 558.50 LCY/Hour <br /> Adjusted multiple scraper team(fleet)hourly production: 558.50 LCY/Hour <br /> Unadjusted unit production/hour: 672.90 LCY/Hour <br /> Optimal Number of Scrapers per push dozer: <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 35.81 Hours <br /> Unit cost: $0.848 /LCY Total job cost: $16,953 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.