My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-12-22_REVISION - M2009035
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2009035
>
2021-12-22_REVISION - M2009035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2021 10:59:33 AM
Creation date
12/22/2021 10:49:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009035
IBM Index Class Name
Revision
Doc Date
12/22/2021
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Andy Azacarraga - M.A. Concrete Construction, Inc.
Type & Sequence
SI1
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> WHEEL LOADER—LOAD AND CARRY WORK <br /> Task description: Construct pond in North Phase <br /> Site: 32.5 Road Gravel Pit Permit Action: 2021 Permit/Job#: M2009035 <br /> PROJECT IDENTIFICATION <br /> Task#: OIA State: Colorado Abbreviation: None <br /> Date: 12/22/2021 County: Mesa Filename: M035-01a <br /> User: ACY <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: CAT 938H Horsepower: 172 <br /> Attachment 1: ROPS Cab Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $35.16 NA <br /> Operating Cost/Hour: $33.22 100 <br /> Operator Cost/Hour: $35.97 NA <br /> Total Unit Cost/Hour: $104.35 <br /> Total Fleet Cost/Hour: $104.35 <br /> MATERIAL QUANTITIES <br /> Initial volume: 1,452 CCY Swell factor: 1.000 <br /> Loose volume: 1,452 LCY <br /> Source of estimated volume: 2009 calc <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Loader Cycle Time: Unadjusted Basic Cycle Time(load,dump,maneuver): 0.483 minutes <br /> Cycle Time Factors Factor(min.) Source <br /> Material: Material 3/4"to 6"diameter 0.00 0.000 (Cat HB) <br /> Stockpile: Dumped by truck 0.02 0.020 (Cat HB) <br /> Truck Ownership: Common ownership of trucks and loaders-0.04 -0.040 (Cat HB) <br /> Operation: Constant operation-0.04 -0.040 (Cat HB) <br /> Dump Target: Fragile target 0.05 0.050 (Cat HB) <br /> Net Cycle Time Adjustment: -0.010 minutes <br /> Adjusted Basic Cycle Time: 0.473 minutes <br /> Rolliniz Resistance—Road Conditions <br /> Haul: Rutted dirt,little maintenance,no water,2"tire penetration 5.0 <br /> Return: Rutted dirt,little maintenance,no water,2"tire penetration 5.0 <br /> Haul and Return Time <br /> Length Grade Res. Rolling Total Res. Travel Time Source <br /> (feet) (%) Res.(%) (%) (minutes) <br /> Haul Route: 700 0.00 5.00 5.00 0.6414 (Cat HB) <br /> Return Route: 700 0.00 5.00 5.00 0.5752 (Cat HB) <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.