My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-12-22_REVISION - M2009035
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2009035
>
2021-12-22_REVISION - M2009035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2021 10:59:33 AM
Creation date
12/22/2021 10:49:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009035
IBM Index Class Name
Revision
Doc Date
12/22/2021
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Andy Azacarraga - M.A. Concrete Construction, Inc.
Type & Sequence
SI1
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mobilization Worksheet Cont'd Task#09A Page 2 of 2 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: GRAND JUNCTION <br /> Total one-way travel distance: 5.00 miles <br /> Average Travel Speed: 35.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $4,586.96 <br /> `*two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost** <br /> **one round trip,no haul rig: $33.16 <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 0.14 0.14 <br /> Return Time(Hours): 0.14 0.14 <br /> Loading Time(Hours): 0.50 NA <br /> Unloading Time(Hours): 0.50 NA <br /> Subtotals: 1.29 0.29 <br /> JOB TIME AND COST <br /> Total job time: 2.57 Hours <br /> Total job cost: $4,620 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.