Laserfiche WebLink
4. Blast Report: The bast report will be completed by the Certified blaster in <br /> charge of the event and will include, at minimum, the following <br /> information. <br /> A. Mine Site <br /> B. Date <br /> C. Time <br /> D. Location of Blast: to include GPS coordinates of initiation point <br /> E. Weather Conditions <br /> F. Number of Holes <br /> Diameter <br /> Depth <br /> G. Size of Blast <br /> Tonnage <br /> Hole spacing/ Burden <br /> H. Explosives: <br /> Amount Used <br /> Stemming Depth <br /> Number of Delays <br /> I. Seismograph Recording <br /> All Blasting will be recorded at the site <br /> A minimum of one seismograph will be placed at a location chosen by <br /> the pit operator. <br /> All blasting at the Meadow Hollow Quarry site will occur between the hours of <br /> 8:OOAM & 3:00 PM and Monday- Friday. Efforts will be made to avoid blasting <br /> during adverse weather conditions. <br /> All blast reports and seismograph recordings will be turned in and stored at <br /> Colorado Quarry 1, LLC main office located at 2431 Nicholson St. Berthoud, CO <br /> 80513 <br />