My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-12-08_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2021-12-08_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2021 2:48:58 PM
Creation date
12/13/2021 11:07:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
12/8/2021
Doc Name
Correspondence
From
Colowyo Coal Company
To
WQCD
Email Name
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:6BC32598-B737-464E-898A-81 F1 F7131339133 <br /> Attachment C. Well Construction Information <br /> At the proposed UIC location approximately 70' of Mancos shale exists between the top of the <br /> injection zone and the base of the Iles Formation, and approximately 520' of mostly shales exists <br /> between the top of the injection zone and the completed interval in the existing Colowyo well <br /> within the AOR (Taylor Creek#3 completed in the Iles Formation). <br /> Other sandstones in the lower Mancos Shale, the lower Cretaceous Dakota Sandstone, the <br /> Jurassic Entrada Sandstone, the Triassic Shinarump Formation, and the Pennsylvanian Weber <br /> Sandstone have been granted EPA aquifer exemptions in Moffat and Rio Blanco counties and thus, <br /> may potentially be considered USDWs in the area. However,these are unlikely to be economical <br /> sources of groundwater due to the depths of these formations in the center portion of the <br /> northeast flank of the Piceance Creek sub-basin. <br /> The proposed UIC well will be completed over the mapped sandstone intervals in the Mancos <br /> Shale below all currently used drinking water aquifers in the Iles and Mesaverde Formations as <br /> shown in Table A-2. 9-5/8" 36#surface casing will be set in a 12-1/4" hole to 2,670'to isolate any <br /> USDWs above the Mancos Shale. 7" 26#casing will be set in an 8-3/4" hole from 2,670'to 4,700' <br /> in the upper Mancos Shale. The well construction diagram is included as Exhibit C-1. <br /> The well will be perforated over the approximate intervals shown in Table A-2. Geophysical logs <br /> will include SP, resistivity, gamma, density, and MIT logs, and actual perforation intervals will be <br /> determined based on the geophysical logs. Injection testing will be conducted as described in <br /> Attachment B. <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.