My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-12-08_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2021-12-08_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2021 2:48:58 PM
Creation date
12/13/2021 11:07:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
12/8/2021
Doc Name
Correspondence
From
Colowyo Coal Company
To
WQCD
Email Name
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:6BC32598-B737-464E-898A-81 F1 F7131339133 <br /> Table B2-1. Proposed SRT Rates <br /> %of Maximum Rate GPM BPM BPD <br /> 5% 15 0.36 518.4 <br /> 10% 30 0.71 1,022.4 <br /> 20% 60 1.43 2,059.2 <br /> 40% 120 2.86 4,118.4 <br /> 60% 180 4.29 6,177.6 <br /> 80% 240 5.71 8,222.4 <br /> 100% 300 7.14 10,281.6 <br /> Afalloff test will be conducted to determine reservoir pressure and estimate aggregate formation <br /> permeability. <br /> It is anticipated that injection interval formation fluids will be sampled as the wellbore is drilled <br /> to help inform the appropriate intervals to perforate and to determine background water <br /> chemistry. These samples will be analyzed for relevant analytes including major cations and <br /> anions, pH, specific gravity, TDS, and conductivity. A complete suite of background analytes is <br /> shown in Table B2-2.The analyte list for the formation fluid is the same as the analyte list for the <br /> injectate water. <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.