My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-12-09_REPORT - C1981044
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981044
>
2021-12-09_REPORT - C1981044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2021 7:58:56 AM
Creation date
12/10/2021 6:39:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Report
Doc Date
12/9/2021
Doc Name
Quarterly Waste Bank Inspection Report Adequacy Review Response
From
DRMS
To
Moffat County Mining, LLC
Annual Report Year
2021
Report Quarter_Month
4
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-..a <br /> COLORADO <br /> Division of Reclamation, <br /> Mining and Safety <br /> Department of Natural Resources <br /> 8 December 2021 <br /> Ms.Miranda Kawcak <br /> Moffat County Mining,LLC. <br /> 29515 Routt County Road 927 <br /> Oak Creek,CO 80467 <br /> RE: Refuse Pile Report Review 2021 Quarter 3 <br /> Williams Fork Mines,Permit No. C1981044 <br /> Dear Ms.Kawcak; <br /> The Colorado Division of Reclamation,Mining and Safety has completed its review of the above <br /> referenced report. Please see the Division's findings below regarding the report's compliance with the <br /> following Rules. <br /> 1. 4.10.2(1) <br /> a. The mine waste bank was inspected,on behalf of the person conducting surface coal <br /> mining operations,by a qualified registered engineer,or other qualified professional <br /> specialist. <br /> b. The report is signed by you,the environmental manager. <br /> c. The report indicates the waste bank was capped and in December 2020 topsoil was <br /> placed on the surface of the waste pile. <br /> d. The 99 excavation waste disposal area was reclaimed in 2009. <br /> 2. 4.10.2(2) <br /> a. The submitted inspection report complies with the inspection requirement of rule <br /> 4.09.1(11). <br /> o This was a quarterly inspection. <br /> o The report indicated the stability of the fills was inspected and no appearances of <br /> instability,structural weakness or other hazardous conditions were noted. The <br /> inspection was conducted on 24 November 2021. However,the Division did not <br /> receive the report until 8 December 2021. <br /> o The Division requests that the operator submit the report so that the Division <br /> will receive it within the required two week time frame outlined in Rule <br /> 4.09.1(11)(c). <br /> b. The stability of the fill was inspected. It does not appear tests were necessary to <br /> evaluate any potential hazard to human life and property. <br /> o Reclamation of the waste bank consisting of capping,placement and compaction <br /> of fill was completed in December of 2020 and seeding in spring of 2021. An <br /> average of 1 foot of topsoil was placed on the fill. <br /> o Drought conditions prevailed throughout 2021,and vegetation is sparse. Recent <br /> fall moisture has spurred some late germination. Interseeding may be necessary <br /> in the future. <br /> o Stability of the waste disposal areas was inspected and problems were not <br /> flF'�010 <br /> 1313 Sherman Street, Room 215, Denver, CO 80203 1 P 303.866.3567 F 303.832.8106 1 https://drms.colorado.,Pov <br /> Jared S. Polis, Governor I Dan Gibbs, Executive Director I Virginia Brannon, Director * 1876 * <br />
The URL can be used to link to this page
Your browser does not support the video tag.