Laserfiche WebLink
{ <br /> A8-T0 <br /> ft- <br /> r . <br /> A43-09 <br /> i' <br /> 'P <br /> 1 t <br /> P_A-70 F-A11 F� <br /> CY <br /> i F-A-10 <br /> r <br /> a <br /> K-A-10 <br /> K-A-11 <br /> a <br /> Map 2: SL23 proposed Phase III bond release parcels. <br /> Permitted topsoil depth replacement on rangeland is 12 inches plus or minus 2 inches(permit page 4- <br /> 256). TMI verifies topsoil replacement thickness by scraper load counts. TMI included a load count and <br /> measured topsoil depth for each reclamation parcel in the bond release application. Post mining <br /> topography has been presented to and approved by the Division in annual reports (technical revisions). <br /> All parcels have previously been Phase I and Phase II bond released as shown in Table 2 above. <br /> Bond Release Blocks Delineation <br /> As discussed in permit section 4.4.1,reclaimed parcels are compared to three different range standards <br /> based on elevation: <br /> 1. Range site A standards apply to elevations greater than 7200 feet <br /> 2. Range site B standards apply to elevations between 6700 and 7200 feet <br /> 3. Range site C to elevations below 6700 feet <br /> Permit Number. C1981010 Page 10 of 16 <br />