Laserfiche WebLink
A LM&AND i + <br /> f- As each pile is constructed, it will be important to create a slight slope to the outside edge of all <br /> lift areas (except the io feet wide benches) so that no trapping of water and snowmelt builds <br /> up and seeps through the piles. There should be no puddles or anything that can trap water in <br /> the embankment. The benches will drain to the sides and carry water from the pile to the <br /> Sediment Ponds below each Pile. <br /> g- Surveying should confirm locations of benches and slopes as the piles expand. <br /> 6 <br />