Laserfiche WebLink
Box 10 Proposed Compensatory Mitigation related to fill/excavation and dredge activities. Indicate in <br /> acres and linear feet(where appropriate) the total quantity of Waters of the United States proposed to be created, <br /> restored, enhanced and/or preserved for purposes of providing compensatory mitigation. Indicate water body type <br /> (tidal wetland, non-tidal wetland, riparian wetland, ephemeral stream/river, intermittent stream/river, perennial <br /> stream/river, pond/lake, vegetated shallows, bay/harbor, lagoon, ocean, etc.) or non-jurisdictional (uplands'). Indicate <br /> mitigation type (permittee-responsible on-site/off-site, mitigation bank, or in-lieu fee program). If the mitigation is <br /> purchase of credits from a mitigation bank, indicate the bank to be used, if known: <br /> 1 For uplands, please indicate if designed as an upland buffer. <br /> Site Water Created Restored Enhanced Preserved <br /> Number BodyType Mitigation Type <br /> yp Area Length Area Length Area Length Area Length <br /> Pond 0.24 permittee- <br /> responsible on-site <br /> Total: 0.24 <br /> If no mitigation is proposed, provide detailed explanation of why no mitigation would be necessary: <br /> If permittee-responsible mitigation is proposed, provide justification for not utilizing a Corps- <br /> approved mitigation bank or in-lieu fee program: <br /> Not applicable. Mitigation bank or in-lieu fee program not available in this area. <br /> Has a draft/conceptual mitigation plan been prepared in accordance with the April 10, 2008, Final <br /> Mitigation Rule and District Guidelines? <br /> zhttp://www.usace.army.miI/Missions/CivilWorks/RegulatoryProgramandPermits/mitig_info.aspx <br /> 3Sacramento and San Francisco Districts-http://www.spk.usace.army.mil/organizations/cespk- <br /> co/regulatory/pdf/Mitigation_Monitoring_Guidelines.pdf <br /> 4Los Angeles District-http://www.spl.usace.army.mil/regulatory/mmg_2004.pdf <br /> 5Albuquerque District-http://www.spa.usace.army.mii/reg/mitigation/SPA%2OFina1%20Mitigation%2OGuidelines_OLD.pdf <br /> ❑ Yes, Attached (or mail copy separately if applying electronically) ❑ No <br /> If no, a mitigation plan must be prepared and submitted, if applicable. <br /> Mitigation site(s) Latitude & Longitude (D/M/s, DD, USGS Quadrangle map name(s): <br /> or UTM with Zone):37.9751 N, -107.7529 W Telluride, CO <br /> Assessor Parcel Number(s): Section(s), Township(s), Range(s): <br /> Sec. 21 T43N R8W <br /> Other location descriptions, if known: <br /> Directions to the mitigation location(s): <br /> Approximately 250 feet north of the Revenue Mine. <br /> Page 6 of 10 <br /> Revised March 21,2012. For the most recent version of this form,visit your Corps District's Regulatory website. <br />