My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-12-07_REVISION - M2012032 (18)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2021-12-07_REVISION - M2012032 (18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2021 11:13:38 AM
Creation date
12/7/2021 11:02:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
12/7/2021
Doc Name Note
Appendix 2: SWMP
Doc Name
Proposed Revision Materials
From
Ouray Silver Mines, Inc
To
DRMS
Type & Sequence
AM2
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OURaY SILVER MINES <br /> Return Period: 10-Year 24-hours <br /> Rainfall, P: 2.60 in <br /> Q= runoff rate (cubic feet per second) =CIA <br /> C= Rational Method runoff coefficient=0.18 <br /> 1 = rainfall intensity(inches per hour)=0.108 <br /> A=drainage area (acres) =0.5 acres <br /> D=storm duration (hours)= 24 hours <br /> Q= (0.18) (0.108)(0.5)=0.00972 CFS=4.36 GPM <br /> The Governor Basin Collection Ditch will be constructed in the Spring of 2022 when weather conditions <br /> allow access to the area.A ditch will be created that will redirect stormwater from the raise bore area <br /> and divert it to a natural drainage to the side of the historic waste piles. <br /> APPENDIX - B MAPS <br /> Stormwater Management Plan 17 1 P a g e <br />
The URL can be used to link to this page
Your browser does not support the video tag.