My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-12-07_REVISION - M2012032 (16)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2021-12-07_REVISION - M2012032 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2021 11:13:38 AM
Creation date
12/7/2021 11:02:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
12/7/2021
Doc Name Note
Appendix 1 - SPCC, ERP, and MCP
Doc Name
Proposed Revision Materials
From
Ouray Silver Mines, Inc
To
DRMS
Type & Sequence
AM2
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CZJRAY-5LV&?MINES <br /> 1.2 Professional Engineer Certification (40 CFR 112.3(d)) <br /> The undersigned Registered Professional Engineer is familiar with the requirements of Part 112 <br /> of Title 40 of the Code of Federal Regulations (40 CFR part 112) and has visited and examined <br /> the facility, or has supervised examination of the facility by appropriately qualified personnel. <br /> The undersigned Registered Professional Engineer attests that this Spill Prevention, Control, <br /> and Countermeasure Plan has been prepared in accordance with best engineering practice, <br /> including consideration of applicable industry standards and the requirements of 40 CFR part <br /> 112;that procedures for required inspections and testing have been established; and that this <br /> Plan is adequate for the facility. [40 CFR 112.3(d)] <br /> This certification in no way relieves the owner or operator of the facility of his/her duty to <br /> prepare and fully implement this SPCC Plan in accordance with the requirements of 40 CFR part <br /> 112. This Plan is valid only to the extent that the facility owner or operator maintains, tests, and <br /> inspects equipment, containment and other devices as prescribed in this Plan. <br /> 1.2.1 Required Improvements <br /> The Professional Engineer's certification of this plan is contingent on the following facility <br /> improvements being implemented for compliance with SPCC regulations 40 CFR 112: <br /> 1) Emergency spill kit items must be placed near hydrocarbon use areas for use <br /> on the entire site. Spill Kits should include impervious containers with <br /> absorbent socks, pillows, pads, gloves, goggles, disposal bags,ties, <br /> instructions and labels. <br /> 2)Training of personnel must occur per Section 3.8 of this plan and designated <br /> employees must become familiar with the spill kit items,their use and proper <br /> reporting in the case of a spill. <br /> Name: Brian K. Briggs, P.E. <br /> Company: Ouray Silver Mines Inc. <br /> State Registration No.: Colorado#31956 <br /> Signature: /W// <br /> Date: <br /> Spill Prevention Control and Countermeasure Plan 6 P a g e <br />
The URL can be used to link to this page
Your browser does not support the video tag.