My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-12-07_REVISION - M2012032 (16)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2021-12-07_REVISION - M2012032 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2021 11:13:38 AM
Creation date
12/7/2021 11:02:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
12/7/2021
Doc Name Note
Appendix 1 - SPCC, ERP, and MCP
Doc Name
Proposed Revision Materials
From
Ouray Silver Mines, Inc
To
DRMS
Type & Sequence
AM2
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Remediation: <br /> - Evaluate situation. <br /> - Certify fire was extinguished. <br /> - Absorb spilled materials, if possible, with earth or other suitable material. <br /> - Transport contaminated soils to the temporary tailings storage area for <br /> temporary storage until an appropriate permanent disposal method and site is <br /> determined. <br /> - Characterized water used to fight fire to assess proper disposal options in <br /> accordance with Colorado Hazardous Waste Regulations. <br /> Other Materials(No fire) AeroFloat 242, Danafloat 067,Aerophine 3418, Oreprep 549, <br /> Polyfroth W20,Floc AF-3091 <br /> PPE: Chemical resistant, tightly fitting goggles, impervious gloves —nitrile or <br /> fluorinated rubber gloves; impervious clothing <br /> Response: <br /> - Evaluate situation. <br /> - Secure area. <br /> - Rescue & First Aid, if necessary &possible. <br /> - Dam or dike ahead of the spill;heavy equipment is available for <br /> earthmoving. <br /> - Cleanup with water is allowed; contain all runoff, excavate an emergency <br /> catch basin, if possible. <br /> Remediation: <br /> - Evaluate situation. <br /> - Absorb spilled materials, if possible,with earth or other suitable material. <br /> - Transport contaminated soils to the Revenue waste pile storage area for <br /> temporary storage until a permanent disposal site is determined. <br /> Revenue Mine May 2021 Rule 8-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.