Laserfiche WebLink
CUM SILVER MINES <br /> 4.2.6 Inspections and Tests (40 CFR 112.8(c)(6)) <br /> Visual inspections of AST's by facility personnel are conducted according to the procedure <br /> described in this Plan. Required maintenance noted during inspections is conducted promptly. <br /> The scope and schedule of certified inspections and tests conducted on the facility's AST's are <br /> specified in STI Standard SP-001. The external inspection includes ultrasonic testing of the shell, <br /> as specified in the standard or if recommended by the certified tank inspector, to assess the <br /> integrity of the tank for continued oil storage. <br /> Recommendations for integrity testing are based on: <br /> • Knowledge of the tank history; <br /> • The fact that all tanks are shop constructed; <br /> • Past tank performance; <br /> • The visible condition of the tank; and <br /> • The quality and volume of secondary containment. <br /> Inspections are signed by the inspector. Inspections and certified inspections and tests are filed <br /> in a central location and maintained for at least 5 years. <br /> Table 4.2 summarizes inspections and tests to be conducted on bulk storage containers. An <br /> environmentally equivalent measure is implemented in place of the external inspection as per <br /> STI Standard SP-001. <br /> Table 4.2 Scope and Frequency of Inspections and Tests <br /> Inspection/Test C-1 C-3 C-5 C-8 <br /> Visual inspection by facility personnel Monthly Monthly Monthly Monthly <br /> Per Section 3.7 Annual Annual Annual Annual <br /> External inspection by certified inspector * EE NA NA NA <br /> l Per STI Standard SP-001 <br /> Internal inspection by certified inspector ** March NA NA NA <br /> Per STI Standard SP-001 2027 _ <br /> EE Refer to Table 4.3. Not required until 2027 given use of environmentally equivalent <br /> measure. <br /> * Internal inspection may be recommended based on findings of the external inspection. <br /> ** or earlier, as recommended by certified inspector. <br /> Spill Prevention Control and Countermeasure Plan 23 1 P a g e <br />