My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-12-07_REVISION - M2012032 (24)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2021-12-07_REVISION - M2012032 (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2021 11:13:38 AM
Creation date
12/7/2021 10:59:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
12/7/2021
Doc Name Note
Exhibit U: Designated Mining Operation Environmental Protection Plan
Doc Name
Proposed Revision Materials
From
Ouray Silver Mines, Inc
To
DRMS
Type & Sequence
AM2
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17 Wildlife Protection <br /> Information about expected wildlife in the permit area is provided in Exhibit H. Disturbed areas <br /> will be reclaimed to wildlife habitat, thus increasing the wildlife value post-reclamation. As <br /> described in the Reclamation Plan (Exhibit E) and shown on Reclamation maps (Exhibit F)the site <br /> will be fully reclaimed to wildlife habitat once the mine is closed, except for a small portion of the <br /> area where the main buildings are located for commercial use after the mine is closed (see Exhibit F <br /> maps for details). <br /> The main Revenue Tunnel will be fitted with a bat gate for bat habitat. The Colorado Division of <br /> Parks and Wildlife commented in their evaluation letter to the DRMS that this was acceptable. <br /> M-2012-032 <br /> Amendment 02 Exhibit U <br /> December 2021 U-33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.