Laserfiche WebLink
Technical Revision 08 (TR-08) <br /> In May of 2016, TR-08 was submitted to permit construction of a bioreactive bed and infiltration <br /> line to create an integrated passive treatment system in which mine portal discharge would pass <br /> from the mine water pond through a bioreactive bed in sediment pond #2 before infiltrating to <br /> groundwater through adjacent waste rock using an infiltration line. These changes were designed <br /> to practically eliminate the flow at Outfa11001, improve mine discharge water quality, and allow <br /> for infiltration of mine discharge water to groundwater. This revision included supporting <br /> documents and updates to Maps G-13, 14, and 15. TR-08 was approved in July of 2016. <br /> Technical Revision 09 (TR-09) <br /> TR-09 was submitted in February 2017. Updates to the permit with this revision included the <br /> following: <br /> • Add and upgrade buildings on site to ease winter operations and maintenance and to <br /> provide offices for staff. <br /> • Permit mill discharge, which will be treated prior to comingling with mine discharge in <br /> the mine water management system. <br /> • Update water quality monitoring requirements. <br /> • Permit the sale of blended tailings and waste rock, provided the blend passes applicable <br /> leachate standards. <br /> TR-09 was approved by DRMS in March of 2017. <br /> Technical Review 10 (TR-10) <br /> TR-10, submitted in August of 2018, included the following updates: <br /> • Construct the five-stage passive mine water treatment system with surface water <br /> discharge at a new industrial wastewater outfall (Outfall 002A) as permitted by the Water <br /> Quality Control Division under Permit No. CO-0000003. <br /> • Construct a new monitoring well (GW-4)to monitor the passive treatment system. <br /> • Relocate a diesel tank to a less congested area of the mine site. <br /> The five-stage passive treatment system with Sneffels Creek discharge via second outfall was <br /> approved as Modification 4 to Colorado Discharge Permit System (CDPS)permit CO-0000003 <br /> on July 31, 2018, effective August 31, 2018. <br /> TR-10 was approved in September of 2018. <br /> Revenue Mine December 2021 3 <br />