Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: TR-16 Update of Buildings Cost <br /> Site: Revenue Mine Permit Action: TR-16 Permit/Job#: M2012032 <br /> PROJECT IDENTIFICATION <br /> Task#: ACY State: Colorado Abbreviation: None <br /> Date: 9/2/2021 County: Ouray Filename: M32-000 <br /> User: ACY <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> Site Clean-up <br /> Ola Removal of Permanent Structures and Surface DEMOLISH 1 180.00 $98,565 <br /> Debris <br /> Olb Disposal of Chemicals-Per TR-14 DEMOLISH 1 16.00 $4,928 <br /> Portal Closure <br /> 02a Contour portal backfill areas DOZER 1 21.99 $6,790 <br /> 02b Reinforce gate at Revenue Portal MINESEAL 1 40.00 $3,000 <br /> Vent Shafts <br /> 03a Shaft foundation and structure removal DEMOLISH 1 80.00 $32,054 <br /> 03b Vent Shaft Closure-Cut Casing BOREHOLE 1 10.00 $204 <br /> 03c Vent Shaft Closure-Place Seal MINESEAL 1 72.00 $5,365 <br /> 03d Vent Shaft Closure-Excavate&Bury EXCAVATE 1 2.47 $482 <br /> Grading <br /> 04a I Minor site grading DOZER 1 8.31 $2,565 <br /> Topsoil/Caprock <br /> 05a Import Topsoil-Purchase and Delivery NA 1 250.00 $176,000 <br /> 05b Spread Topsoil on TSF DOZER 1 7.33 $2,262 <br /> 05c Transport ca rock for Atlas TSF TRUCKI 1 17.02 $8,715 <br /> 05d Spread Caprock on TSF DOZER 1 28.16 $8,694 <br /> Revegetation <br /> 06a Reveg TSF REVEGE 1 30.00 $7,245 <br /> 06b Reveg Vent Shafts REVEGE 1 10.00 $4,394 <br /> Equipment Mobilization <br /> 07a Initial Mobilization MOBILIZE 1 11.14 $16,140 <br /> 07b Walk equipment to Governors Basin MOBILIZE 1 18.66 $4,469 <br /> 07c Secondary Mobilization MOBILIZE 1 7.14 $1,708 <br /> SUBTOTALS: 810.22 $383,580 <br />