Laserfiche WebLink
Mobilization Worksheet Cont'd Task#07B Page 2 of 2 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: REVENUE-GOV <br /> BASIN <br /> Total one-way travel distance: 3.50 miles <br /> Average Travel Speed: 0.75 mph <br /> Total Non-Roadable Mob/Demob Cost* $3,751.73 <br /> `*two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost** <br /> **one round trip,no haul rig: $717.08 <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 4.67 4.67 <br /> Return Time(Hours): 4.67 4.67 <br /> Loading Time(Hours): 0.00 NA <br /> Unloading Time(Hours): 0.00 NA <br /> Subtotals: 9.33 9.33 <br /> JOB TIME AND COST <br /> Total job time: 18.67 Hours <br /> Total job cost: $4,469 <br /> CIRCES Cost Estimating Software <br />