My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-12-07_REVISION - M2012032 (7)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2021-12-07_REVISION - M2012032 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2021 11:13:15 AM
Creation date
12/7/2021 10:52:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
12/7/2021
Doc Name Note
Exhibit L: Reclamation Costs
Doc Name
Proposed Revision Materials
From
Ouray Silver Mines, Inc
To
DRMS
Type & Sequence
AM2
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mobilization Worksheet Cont'd Task#07A Page 2 of 2 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: MONTROSE <br /> Total one-way travel distance: 45.00 miles <br /> Average Travel Speed: 35.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $15,942.94 <br /> `*two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost** <br /> **one round trip,no haul rig: $197.56 <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 1.29 1.29 <br /> Return Time(Hours): 1.29 1.29 <br /> Loading Time(Hours): 1.50 NA <br /> Unloading Time(Hours): 1.50 NA <br /> Subtotals: 5.57 2.57 <br /> JOB TIME AND COST <br /> Total job time: 11.14 Hours <br /> Total job cost: $16,140 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.