My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-12-07_REVISION - M2012032 (7)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2021-12-07_REVISION - M2012032 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2021 11:13:15 AM
Creation date
12/7/2021 10:52:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
12/7/2021
Doc Name Note
Exhibit L: Reclamation Costs
Doc Name
Proposed Revision Materials
From
Ouray Silver Mines, Inc
To
DRMS
Type & Sequence
AM2
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAFEGUARDING UNDERGROUND OPENINGS <br /> Task description: Vent Shaft Closure-Place Seal <br /> Site: Revenue Mine Permit Action: TR-16 Permit/Job#: M2012032 <br /> PROJECT IDENTIFICATION <br /> Task#: 03C State: Colorado Abbreviation: None <br /> Date: 9/2/202110:53:34 County: Ouray Filename: M032-03c <br /> AM <br /> User: ACY <br /> Agency or organization name: DRMS <br /> UNIT COSTS <br /> Opening Description Dimensions Closure Method Quantity Unit Unit <br /> Cost Total Cost <br /> 960 Raise-Plate 6'x 6' Shaft closure-grate(per sq. 36.00 SF $32.50 $1,170.00 <br /> ft. <br /> Yellow Rose Shaft-Plate 6'x 6' Shaft closure-grate(per sq. 36.00 SF $32.50 $1,170.00 <br /> ft.) <br /> Monongahela Shaft 8'x 8' Shaft closure-grate(per sq. 64.00 SF $32.50 $2,080.00 <br /> (escape)- Plate ft. <br /> 960 Raise-Cement Cap 6'x 6'x 6" Shaft closure-concrete cap, 18.00 CF $13.89 $250.02 <br /> poured-in-place(per Cubic <br /> Feet) <br /> Yellow Rose Shaft- 6'x 6'x 6" Shaft closure-concrete cap, 18.00 CF $13.89 $250.02 <br /> Cement Cap poured-in-place(per Cubic <br /> Feet <br /> Monongahela Shaft 8'x 8'x 6" Shaft closure-concrete cap, 32.00 CF $13.89 $444.48 <br /> (escape)- Cement Cap poured-in-place(per Cubic <br /> Feet) <br /> Job Hours: 72.00 Total Cost: $5,364.52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.