My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-12-07_REVISION - M2012032 (7)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2021-12-07_REVISION - M2012032 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2021 11:13:15 AM
Creation date
12/7/2021 10:52:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
12/7/2021
Doc Name Note
Exhibit L: Reclamation Costs
Doc Name
Proposed Revision Materials
From
Ouray Silver Mines, Inc
To
DRMS
Type & Sequence
AM2
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEMOLITION WORK <br /> Task description: Shaft foundation and structure removal <br /> Site: Revenue Mine Permit Action: TR-16 Permit/Job#: M2012032 <br /> PROJECT IDENTIFICATION <br /> Task#: 03A State: Colorado Abbreviation: None <br /> Date: 9/2/202110:49:43 County: Ouray Filename: M032-03a <br /> AM <br /> User: ACY <br /> Agency or organization name: DRMS <br /> UNIT COSTS Location adiustment: 87.60 % <br /> Structure or Item Demolition Menu <br /> Description Dimensions Selection Quantity Unit Unit Cost Total Cost <br /> 960 Raise Shaft- TR-11 PAR USER PROVIDED 1.00 EA $14,333.33 $14,333.33 <br /> Superstructure& Demo ITEM <br /> foundation <br /> Yellow Rose Shaft- TR-11 PAR USER PROVIDED 1.00 EA $14,333.33 $14,333.33 <br /> Superstructure& Demo ITEM <br /> foundation <br /> Monongahela TR-11 PAR Demo.and on-site 144.00 SF $1.95 $280.94 <br /> Shaft/Hoist disposal in existing pit, <br /> Foundation 12 in.thick-Max. 50 <br /> ft.push <br /> Monongahela TR-11 PAR Plant(1S)demo./on-site 2,304.00 CF $0.29 $677.38 <br /> Shaft/Hoist- disposal in existing pit <br /> Superstructure or cut-Max. 50 ft.push <br /> Monongahela-Lift TR-11 PAR Plant(1S)demo./on-site 4,000.00 CF $0.31 $1,224.00 <br /> house disposal in existing pit <br /> or cut-Max.200 ft. <br /> push <br /> Monongahela- DRMS Demo.only,small or 8,000.00 CF $0.18 $1,432.00 <br /> Refuge Chamber single buildings(single <br /> story)-Steel structures <br /> Monongahela-CMP DRMS Pipe,corrugated metal 100.00 LF $43.10 $4,310.10 <br /> Walkway (CMP)- 96 in.diameter <br /> pipe <br /> Total Cost <br /> Subtotal (adjusted for <br /> Job Hours: 80.00 (unadjusted): $36,591.08 location): $32,053.79 <br />
The URL can be used to link to this page
Your browser does not support the video tag.