My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-12-07_REVISION - M2012032 (21)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2021-12-07_REVISION - M2012032 (21)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2021 11:13:38 AM
Creation date
12/7/2021 10:49:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
12/7/2021
Doc Name Note
Exhibit E: Reclamation Plan
Doc Name
Proposed Revision Materials
From
Ouray Silver Mines, Inc
To
DRMS
Type & Sequence
AM2
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Portal Reclamation Steps <br /> Underground Storage Room Remove steel doors or leave in place <br /> Backfill with demolition debris and waste rock into <br /> tunnel <br /> Regrade backfill slope to 21-1:1 V <br /> Mill Remove steel doors or leave in place <br /> Backfill with demolition debris and waste rock into <br /> tunnel <br /> Regrade backfill slope to 21-1:1 V and revegetate <br /> Revenue Install steel bat gate on portal <br /> Backfilling will be conducted via dozer to the surface highwall. No bat survey has <br /> been conducted in this area and no bats have been observed in the existing Revenue <br /> Tunnel, however, the Division of Parks and Wildlife (DPW) stated that the installation <br /> of a bat gate at this portal was acceptable in their comment letter on the original permit <br /> application. <br /> 3.5 Backfill Ponds and Collection Ditches <br /> Sediment Pond #1 will remain in place as a sediment control feature during <br /> reclamation of the Atlas TSF. The mine water ponds # 1, 2, and 3 will remain after <br /> reclamation, as shown on Map F-1. These features will not be backfilled or regraded <br /> as they were constructed to blend in with the existing contours at the site. Mine water <br /> will continue to be delivered by gravity in HDPE pipes to the mine water pond and the <br /> water will flow into Ponds 2 and 3 for passive treatment prior to discharge to Sneffels <br /> Creek(TR-10) via Outfall 002A as part of CDPS Permit CO-0000003. Map F-1 <br /> shows the remaining earthworks, which are previously disturbed areas composed of <br /> waste rock from previous mining operations, for each pond. The collection ditches <br /> surrounding Waste Piles will remain to divert water from the Waste Piles. Other <br /> collection ditches will be removed once the revegetation of disturbed mine areas is <br /> successful. <br /> Exhibit E Reclamation Plan E-7 <br /> Amendment 02 <br /> December 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.