2 RECLAMATION TIMETABLE <br /> The reclamation timetable below is based on the projections for the mine and the amount <br /> of reclamation that is needed after mine shutdown. Once the mine is permanently <br /> closed, reclamation is expected to take approximately 6 months. <br /> Table E-2 Reclamation Timetable <br /> Task# Description Time <br /> Needed <br /> (Months) <br /> 1 Commence mining. complete construction of and Atlas 3 <br /> TSF regrading <br /> 2 Mine underground ore material and construct Revenue 42.1 <br /> TSF. <br /> 3 Mine underground ore material and build Atlas TSF. 26.1 <br /> Cap and revegetate Revenue TSF. Store topsoil for Atlas <br /> TSF. <br /> 4 Complete mining. Cap and revegetate Atlas TSF 2 <br /> 5 Backfill underground storage and mill portals. 2 <br /> 6 Remove select surface facilities 1 <br /> 7 Backfill underground storage portal and tailings loadout 0.5 <br /> portal <br /> 8 Cap and revegetate remaining disturbance areas. Install 1 <br /> Revenue Portal bat gate. <br /> Total Months 77.7 <br /> Total Years 6.48 <br /> Exhibit E Reclamation Plan E-3 <br /> Amendment 02 <br /> December 2021 <br />