Laserfiche WebLink
11 MONITORING RECLAMATION SUCCESS <br /> Monitoring of reclaimed areas on an ongoing basis during mining operations and during <br /> the post-closure period will help to assure successful reclamation. The operator plans to <br /> consult with the local NRCS office in Ouray County prior to and after reclamation to <br /> determine preferred methods for minimizing erosion and enhancing revegetation. If minor <br /> changes or modifications are needed to the seeding and reclamation plan, revision plans <br /> will be submitted to the Division of Reclamation, Mining and Safety as required. A <br /> summary of the areas disturbed and reclaimed and any other important items regarding site <br /> monitoring and reclamation will be submitted to the Division in annual reports. <br /> 12 RECLAMATION COSTS <br /> Reclamation cost tables are provided in Exhibit L. <br /> Exhibit E Reclamation Plan E-12 <br /> Amendment 02 <br /> December 2021 <br />