My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-12-07_REVISION - M2012032 (25)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2021-12-07_REVISION - M2012032 (25)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2021 11:13:38 AM
Creation date
12/7/2021 10:48:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
12/7/2021
Doc Name Note
Exhibit D: Mine Plan
Doc Name
Proposed Revision Materials
From
Ouray Silver Mines, Inc
To
DRMS
Type & Sequence
AM2
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1 1 1 Mine Equipment <br /> Underground Equipment Number <br /> FMC Bean Pump 5 <br /> Climbers <br /> Alimak Raise Climber 3 <br /> Exhaust Fans <br /> JetAir 10HP 7 <br /> JetAir 30HP 1 <br /> JetAir 40HP 1 <br /> SMJ 20HP 1 <br /> Spendtrup 30HP 4 <br /> MPC <br /> 150 KVA Mine Power Center 1 <br /> 300 KVA Mose Power Center 1 <br /> 150 KVA Mrift Power Center 1 <br /> 500 KVA Mouth Power Center 1 <br /> 500 KVA Maise-1 Power Center 1 <br /> 300 KVA More Power Center 1 <br /> 3.3 Ventilation <br /> Three ventilation shafts are proposed for the mine. Two of the three (i.e.,the 960 Shaft and the Yellow <br /> Rose Shaft)ventilation shaft permit areas are 100' x 100' in size, or 0.23 acres. These two shafts have not <br /> been constructed. Once the 960 shaft and Yellow Rose shaft are complete, secondary escapeways will be <br /> installed in each as well.Waste rock from the shaft excavation will be brought out through the Revenue <br /> tunnel and delivered to the two TSFs. <br /> The third raise bore/ventilation shaft,the Hubb Reed Raise,was completed in 2015 using a raise bore. <br /> This shaft provides ventilation and serves as a secondary escapeway. The current affected lands boundary <br /> around the Hubb Reed Shaft also is 100' x 100'. OSMI is proposing to increase the affected lands <br /> boundary around the Hubb Reed Shaft to approximately 1.16 acres to accommodate the refuge chamber <br /> and other surface features. <br /> The locations of the three shafts are shown on Map C-2. See Map C- lb for the proposed affected lands <br /> boundary for the Hubb Reed Shaft area. The shafts will be installed from within the mine using the same <br /> methods as other raises or by raise bore. <br /> Stripping topsoil from these shafts prior to construction will not be practical as there is very little topsoil <br /> in the area. Should topsoil be encountered at the top of the shafts,it will be stored in a berm around the <br /> shaft exit to reduce surface water runoff inflows into the shaft. A pad will be constructed at the top of <br /> each shaft. This pad will be concrete, 10' x 10' square and 12 inches thick. The shaft openings will be up <br /> to six feet in diameter. The holes will be cased and grouted as necessary to prevent water from potential <br /> upper aquifers from entering the mine workings. <br /> Revenue Mine <br /> Amendment 02 D-6 <br /> December 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.