During the adequacy review period, the Governor Basin area was removed from the permit <br /> amendment. Amendment 01 resulted in the following: <br /> • Add approximately 16.34 areas to the permit boundary at the main portal area to increase <br /> the total permitted area to 50.53 acres, which includes the three shafts. <br /> Technical Revision 05 (TR-05) <br /> In January of 2015, TR-05 was submitted to DRMS to modify the existing permit and address <br /> the following issues: <br /> • Provide information on the thickener that is proposed as an outside structure near the mill <br /> building. <br /> • Add a new concrete apron outside the filter building with a trough, sump, and pump to <br /> ensure that no tailings slurry from the two filter bays or other chemicals leave the filter <br /> building area. <br /> • Revise of the chemical list for the chemicals stored on-site for the milling process. <br /> All narrative for this addition is submitted as a new Appendix, which is Appendix 17. New mine <br /> plan maps are included to show these changes. Maps for the thickener and the trough/sump are <br /> also enclosed in Appendix 17. <br /> As part of this revision, Appendix 17 was added, and Exhibit L, Maps C-2, C-3, and C-4 were <br /> revised. TR-05 was approved in May of 2015. <br /> Technical Revision 06 (TR-06) <br /> TR-06 was submitted in June of 2015 in response to the detection of elevated metals <br /> concentrations in monitoring wells GW-2A and GW-3A. To reduce the leaching of metals from <br /> the TSFs, TR-06 modified the existing permit so that the tailings material will be placed with a <br /> paste pH of up to 10.5. The elevated pH of the tailings material would mitigate the potential that <br /> metals will be dissolved from contact with runoff. No documents were modified as part of this <br /> revision. DRMS approved TR-06 in July of 2015. <br /> Technical Revision 07 (TR-07) <br /> TR-07 was submitted in June of 2015. This revision would allow mine water to be pumped from <br /> the Atlas/Cumberland and Yellow Rose drift to the No. 1 shaft and lower workings via the F 10 <br /> Raise. Ultimately, TR-07 was withdrawn in August of 2015. <br /> In November of 2015, the mine operator changed from Fortune Revenue Silver Mines, Inc. to <br /> Ouray Silver Mines, Inc. <br /> Revenue Mine December 2021 2 <br />