Laserfiche WebLink
6. Water Rights-The Godfrey Ditch shares associated with this land have been sold. Hunt <br /> Brothers has the dry up credits that are associated with the property. Existing agriculture water <br /> shares in the area are being bought to support front range municipal development and will <br /> change the agriculture character of the area. <br /> 7. The typical hours of operation are between 6:00 AM and 4:00 PM,Monday through Friday, but <br /> this schedule is subject to occasional change. <br /> 8. Site Controls— <br /> a. Signs will include a Mined Land Reclamation Board (MLRB)/Division of Reclamation, <br /> Mining and Safety(DRMS)permit sign, safety, no trespassing,various traffic control, <br /> safety instructions, inventory, permit and mine boundary signs. <br /> i. The public may not enter the mine site without an escort. Posting of"No <br /> Trespassing"signs will take place along the mine perimeter. <br /> ii. ASCI, MLRB/DRMS sign at the entrance of the Stiles Mining Resource will be <br /> clearly visible from CR 394 and will have the Name of Operator, a statement <br /> that a reclamation permit has been issued by the MLRB and the mined land <br /> reclamation permit number.ASCI will keep this sign throughout mining and <br /> reclamation of the site. <br /> b. A water truck will apply water to haul roads and work areas to control dust. <br /> c. ASCI will notify DRMS and Colorado Department of Public Health and Environment <br /> (CDPHE)of any toxic or hazardous substance spills, including spills of petroleum <br /> products,within the permit area. <br /> d. Litter is not a significant concern. The inert material types coming onto the site, <br /> typically do not have significant amounts of trash. Employees will deposit litter/trash in <br /> on site dumpsters. <br /> e. Employees will use metal recycle bins to hold metal that is generated at the recycle <br /> aggregate material yard.A commercial disposal and recycle operator will supply the <br /> bins and dumpsters.A commercial hauler will remove the contents on a regular <br /> schedule for recycling or disposal. <br /> f. A fire extinguisher is mandatory on all equipment. Employees training supports the safe <br /> use of an extinguisher. Employees may use on-site soils to smother the fire. <br /> L The materials imported to the site for backfill will be clean inert material and <br /> will not be combustible. <br /> ii. Employees will not accept the delivery of organic materials or allow organic <br /> substances as backfill material. <br /> g. Prior to working at the site,all employees are trained for an adequate response in case <br /> of an emergency, each is aware of site safety plans and all employees are certified as <br /> Mine Safety and Health Administration (MSHA), Part 46 new or experienced miners. <br /> h. A minimum of one on site employee is certified as Heart Saver, in First Aid, in CPR, and <br /> in the use of AED. <br /> i. Equipment and trucks will generate the only noise on the site.All equipment is <br /> equipped with proper mufflers and backup alarms to assure compliance with noise <br /> standards. <br /> j. A commercial sanitation company will supply and maintain portable toilets. <br /> H:\Plts HBP Plants\EVANS\Stlles Mining Resource\Exh D-Mine Plan\Mine Plan Draft.docx <br />