2.2 Test Pits <br /> Tests pits were excavated around the inner perimeter of the Treiber A at approximately 100 <br /> to 200 foot spacing as a component of the reclamation slope designs. The test pits were <br /> excavated about halfway up the slopes and extended into native sand and gravel and <br /> occasionally deeper to the top of bedrock. Although most of the materials excavated and <br /> tested from the test pits will not be encountered during tunnel construction, the slope liner <br /> materials and geometry may impact shaft construction and should be considered when <br /> developing shoring designs. <br /> Laboratory test results from the test pits are summarized in Table 2. Complete lab testing <br /> results are included in Appendix B. <br /> Table 2: Test Results from Treiber A Test Pit Samples <br /> Approx Gradation Atterberg Limits <br /> Test Depth Gravel Sand Fines Liquid Plasticity Unified Soil Soil <br /> Area Pit (ft) N (%) (%) Limit Index Classification Unit <br /> TP1 5 4 44 52 27 11 CL Clayey <br /> Fill <br /> Zone 2 TP8 8 36 56 8 NL NP SW-SM Pit Run <br /> TP16 5 18 70 12 NL NP SW-SM Clayey <br /> Fill <br /> TP19 1 23 60 17 29 15 SC Clayey <br /> Fill <br /> Zone 1 Clayey <br /> TP26 5 55 31 14 30 13 GC Fill <br /> Zone 3 TP33 4 12 43 45 27 9 SC Clayey <br /> Fill <br /> 2.3 Topographic Survey <br /> Topographic information within Overland Ponds Pond 1 was obtained by Civil Arts in 2011. <br /> An as-built topographic survey within Overland Ponds Pond 2 was performed by King <br /> Surveyors, Inc., in November, 2013. <br /> A topographic survey inside the Treiber A slurry wall footprint was conducted by King <br /> Surveyors, Inc. in June 2014 to establish existing conditions within the reservoir to assist in <br /> reclamation slope design. The existing conditions within Treiber A during interconnect <br /> construction is anticipated to be as shown on the interconnect design drawings. Topographic <br /> surveys of Overland Ponds Pond 1, Overland Ponds Pond 3, and Treiber B were not provided <br /> to GEI or have not been performed. Overland Ponds Pond 3 surveying is scheduled for <br /> October 2014. <br /> G E 1 M Field Investigations 1 7 <br />