My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-12-03_REVISION - M2011049
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2011049
>
2021-12-03_REVISION - M2011049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2025 7:10:59 AM
Creation date
12/6/2021 8:56:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011049
IBM Index Class Name
Revision
Doc Date
12/3/2021
Doc Name
Request for Technical Revision
From
Blue Earth Solutions
To
DRMS
Type & Sequence
TR1
Email Name
AME
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Field Investigations <br /> GEI performed a field investigation within Overland Ponds Pond 2 and Treiber A in June 2014 <br /> in support of the Overland Ponds Pond 2 to Treiber A interconnect and the Treiber A slope <br /> reclamation designs. The investigation included advancing geotechnical borings near the <br /> interconnect alignment and excavating test pits within the existing slopes of Treiber A. An <br /> additional investigation consisting of geotechnical borings and topographic survey is planned <br /> for the Treiber A to Treiber B interconnect after Treiber B is dewatered in October 2014. <br /> 2.1 Boreholes <br /> Three geotechnical boreholes (B 101, B 102A, and B 103) were advanced for the Overland <br /> Ponds Pond 2 to Treiber A interconnect to investigate subsurface conditions within the gravel <br /> pit and in the unmined area between Overland Ponds Pond 1, Overland Ponds Pond 2, and <br /> Treiber A. The boreholes were field located roughly in a straight line near the proposed <br /> interconnect alignment. Boreholes were located at the toe of the embankment in Overland <br /> Ponds Pond 2 (B 101), in the unmined area between Overland Ponds Pond 2 and Treiber A <br /> (B 102A) and toe of the embankment in Treiber A (B 103). <br /> Borelogs from the investigation are included in Appendix A. Laboratory test results from the <br /> investigation are summarized below in Table 1. Complete lab testing results are included in <br /> Appendix B. <br /> l7 Field Investigations 15 <br /> G E I .., <br />
The URL can be used to link to this page
Your browser does not support the video tag.