Laserfiche WebLink
Review of Blasting Operations at Denver Brick Company's Golden Mine <br /> 5.2 Paul Stanton <br /> Consultant— Stanto Group Inc <br /> South Jordan, UT 84095 <br /> Cell: (303) 408-0113 <br /> E-mail: paul.18.stantonOgmail.com <br /> Education Credentials <br /> Colorado School of Mines - Major: Mining Engineer, 3.92 <br /> Minor: Explosives Engineering, 4.0 <br /> EXPERIENCE <br /> 2017 -Technical Representative for BME, Zambia <br /> Provided direct technical explosives support to Kansanshi Open Pit Copper Mine in Zambia, <br /> Africa. <br /> Designed blast patterns using BlastMap"m III software that show the energy distribution and <br /> movement direction of blasted rock. <br /> Implemented the AXXISTm Electronic Blasting system using electronic delay detonators. <br /> 2018- Data Analysis Engineer for NASA <br /> Worked on team as evaluator for training programs under Instrument and Payload Systems <br /> Engineering Branch at Goddard Space Flight Center <br /> Evaluated data collected from training programs and generated Heat Maps in Excel and <br /> MATLAB <br /> Built reports in Microsoft Word and LaTex for correlation of training programs used at NASA <br /> 2018 - Consultant for Patriot Powder, LLC <br /> Technical Sales representative providing sales support for the AXXIS"M electronic detonator <br /> system <br /> Built retail pricing model for Western US business using North American explosive <br /> manufacturers products <br /> Developed State of Wyoming Blaster Training 24-hour course with blast design, explosive <br /> usage, vibration monitoring, Explosives transporting and preparatory training sections <br /> Developed Wyoming, Colorado, Nevada, and Utah business plans <br /> 2019- Present- Planning Engineer for Rio Tinto, Kennecott Bingham Canyon Mine <br /> Assisted the senior Drill & Blast Engineer with the MineSight layout of blast patterns <br /> Develop daily plan for shovels and drills. Coordinate daily with teams impacted by the <br /> changing environment in the pit. <br /> Developed monthly haul truck speed model reconciliation tool by constructing a monthly <br /> haulage network based on proportional good vs. bad weather days to validate if actual is <br /> following to plan. Showed the total, loaded, empty cycle times comparison to distance to <br /> show variance between them and if the MS Haulage is faster or slower than actual <br /> Updated speed model by comparing total cycle times to correlate with distance. Calculated the <br /> impact to operating hours with the new speed restrictions to the current model vs. the base case <br /> model. <br /> Experience in 3 month planning for shovels by incorporating each input of various stakeholders <br /> to align towards EOY quarterly forecast predictions. <br /> 22 <br />