Laserfiche WebLink
Stockpile Profile <br /> w Stockpile Profile- End View <br /> ,,, I--50•—� Visual Berm <br /> �5' 20' <br /> 80. <br /> Stockpile Profile -Side View <br /> --- 340' vww Berm <br /> 1 20' <br /> I - - - 400' i <br /> NORTH ACCESS ROAD <br /> Underground workings encountered during mining operations <br /> • will be filled as the work proceeds. Typically, 50-100 cubic yards <br /> ' of fill have been sufficient for the average opening. <br /> • e / Permit/Affected Area Boundary: <br /> 70.15 Ac <br /> y t} Mine Area: 30.6 Ac <br /> Overburden: 5.3 Ac <br /> •` Stockpile: 7.4 Ac <br /> Roads: 3.49 Ac <br /> Stockpile Pad/Processing Area: <br /> 12.7 Ac <br /> Room for as many as 5 stockpiles. <br /> Typically no more than 3 stockpiles <br /> simultaneously. <br /> Each stockpile contains as many <br /> as 13,600 cubic yards of material. <br /> The visual berm will contain as <br /> much as 16,000 cubic yards of <br /> topsoil and fill material <br /> see stockpile profile <br /> , <br /> su <br /> LAT:39'47'16.06 <br /> L_ON:105013'51.8 <br /> EAST ACCESS ROAD: ';` <br /> 25'WIDE i <br /> ti, l <br /> ua er Section 16 <br /> w � <br /> ' Township 3 South - <br /> t Range 70 West <br /> Drawn By: M-1976-007UG _ Rev. Date By: <br /> Richard Murphy Rule 6.4.3 Denver Brick Company -- ------ <br /> rion Golden Mine Date: 2-25-21 001 11-4-21 R.Murphy <br /> Exhibit C-7: --- Exploration Department Scale: 1'=200' <br /> Mine Plan and Existing Conditions Conversion-01 Denton, Texas — <br />