My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-11-29_REVISION - M1977215
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977215
>
2021-11-29_REVISION - M1977215
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2024 4:51:41 AM
Creation date
11/30/2021 8:45:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
REVISION
Doc Date
11/29/2021
Doc Name
Change of Status Notification
From
Rio Grande Silver, Inc
To
DRMS
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RIO GR NDE <br /> SILVER ,, INC.. <br /> November 22, 2021 <br /> State of Colorado RECEIVED <br /> Department of Natural Resources <br /> Division of Reclamation, Mining and Safety NOV 2 9 2021 <br /> 1313 Sherman Street, Suite 215 <br /> Denver Colorado 80203-2273 <br /> Colorado Division of Reclamation, <br /> RE: Change of Status Notification Mining and Safety <br /> Division of Reclamation, Mining and Safety, <br /> Attn: Lucas West <br /> Rio Grande Silver (RGS) is scheduled to resume underground activities in April 2022 <br /> at the Bulldog Mine Operation, Permit No. M-1977-215. RGS is therefore requesting a <br /> permit change of status from Temporary Cessation to Active. <br /> Underground activities in 2022 will be the first year of a multi-year rehabilitation and <br /> pre-development program to determine if the project is economically viable before <br /> moving forward with the construction and operation of a water treatment plant, <br /> additional waste rock and tailings storage facilities and mining and milling operations. <br /> Planned work for 2022 includes the following: <br /> • Dewater the 9360 Level. <br /> • Conducting rehabilitation work from the end of the 9400 decline back to the <br /> 93059 stope. Approximately 3,000 feet of rehabilitation work. This will allow <br /> access to the southern end of the resource to begin resource confirmation work <br /> that includes channel sampling and core drilling. <br /> • Establish a water management system that prevents the 9360 Level from <br /> filling with water (See Figure 1). <br /> Rehabilitation and resource confirmation work that includes channel sampling and <br /> core drilling will continue on the southern end of the resource in Year 2 (See Figure 2) <br /> continuing to the North end of the resource in Year 3 (See Figure 3). <br /> Sincerely, <br /> �011VA 41 t","tt <br /> Randy McClure <br /> Consultant <br /> Rio Grande Silver, Inc. <br /> PO Box 610 <br /> 625 USFS Road 504.IA <br /> Creede, CO 81130 <br /> ph: 719.658.1080 <br /> cell:970.317.5355 <br /> rmcclure@heclo-mining.com <br /> 625 USFS Road 504.1A P.O. Box 610 Creede, CO 81130 <br /> 719-658-1080 <br />
The URL can be used to link to this page
Your browser does not support the video tag.