Laserfiche WebLink
Proposed Decision <br /> The Colorado Division of Reclamation,Mining and Safety proposes to approve,the application <br /> for a permit revision (PR-02) for the Hayden Gulch Loadout. <br /> The application was submitted by Hayden Gulch Terminal, LLC for the Loadout. This decision <br /> is based on a finding that the operations will comply with all requirements of the Colorado State <br /> Program as found in the Colorado Surface Coal Mining Reclamation Act, Section 34-33-101 et <br /> seq., C.R.S., and the Regulations promulgated pursuant to the Act. If no request for a formal <br /> hearing is made within thirty (30) days of the first publication of the issuance of this proposed <br /> decision,then this decision becomes final. Upon submittal of acceptable surety by the applicant, <br /> the revision will be issued. The revision application, all supporting documentation and any <br /> stipulations or conditions will become a binding part of the permit. <br /> No coal mining operations may be conducted on any Federal surface or coal until the Secretary <br /> of the Interior has approved the proposed mining plan. <br /> 2 <br />