My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-11-24_INSPECTION - M1997058
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1997058
>
2021-11-24_INSPECTION - M1997058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2021 12:40:01 PM
Creation date
11/24/2021 8:43:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997058
IBM Index Class Name
Inspection
Doc Date
11/24/2021
Doc Name
Inspection Report
From
DRMS
To
Hall Irwin Aggregates, LLC
Inspection Date
11/16/2021
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERMIT#:M-1997-058 <br /> INSPECTOR'S INITIALS: ECS <br /> INSPECTION DATE:November 16,2021 <br /> OBSERVATIONS <br /> This was a monitoring inspection conducted by DRMS at the Hall Irwin Baseline Resource site. This site is <br /> located near the intersection of WCR 2 (Baseline Road) and WCR23 immediately northwest of Brighton in <br /> Weld County. There are 209.6 acres currently permitted at this 112c site. The inspection was conducted by Eric <br /> Scott of DRMS. The DRMS representative met with permittee representatives Ed Lafferty of Hall-Irwin at the <br /> site entrance at approximately 09:30. DRMS noted that the site identification signs were present for both <br /> Baseline and adjacent permit Parker-Dersham(M2006-003)near the former entrance to the property off of <br /> WCR2 (Photo 1). <br /> The inspection was requested by Hall-Irwin to get DRMS feedback and documentation of the reclamation work <br /> that has been completed on the Baseline and Parker-Dersham permits over the 2021 season. During a 2020 <br /> inspection of the site it was noted that mining activity ended at this site several years ago, and the majority of <br /> the remaining work to be done consisted of cleaning up the reservoir areas above water line (removal of excess <br /> overburden, surface grading, and replacing topsoil stockpiles) and establishing the appropriate reclamation <br /> vegetation. The lined reservoirs have been approved by the SEO office. <br /> As can be seen in the attached site photos (Photos 2-6), all overburden and topsoil stockpiles have been <br /> removed or replaced, all shoreline and upland areas have been regraded, and all areas above the reservoir <br /> waterline have been seeded and mulched. Some additional work required by the SEO office was also <br /> completed under TR3 as approved by DRMS in July of 2021. The work completed to date at the site looks <br /> very well-done, and all that remains at the Baseline site for full reclamation to be completed is for the newly <br /> seeded vegetation to establish. This will likely take a few growing seasons, and in the meantime, the site will <br /> need to be maintained and site mowing and weed control activities conducted as needed. <br /> Inspection Contact Address <br /> Ed Lafferty <br /> Hall-Irwin Aggregates,LLC <br /> 5586 W 19th Street Suite 2000 <br /> Greeley,CO 80634 <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.