My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-11-23_REVISION - C1992081 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992081
>
2021-11-23_REVISION - C1992081 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2021 10:29:49 AM
Creation date
11/23/2021 10:28:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Revision
Doc Date
11/23/2021
Doc Name
Proposed Decision Letter & Form
From
DRMS
To
Hayden Gulch Terminal, LLC
Type & Sequence
PR2
Email Name
TNL
JDM
Media Type
D
Archive
No
Supplemental fields
Permit Order
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />1313 Sherman St. Room 215 Denver, CO 80203 P (303) 866-3567 F (303) 832-8106 https://drms.colorado.gov <br />Jared Polis, Governor | Dan Gibbs, Executive Director | Virginia Brannon, Director <br />1313 Sherman St. Room 215 <br />Denver, CO 80203 <br />November 23, 2021 <br /> <br />Miranda Kawcak <br />Hayden Gulch Terminal, LLC <br /> <br />P.O. Box 670 <br />Hayden, CO 81639 <br /> <br /> <br />Re: Hayden Gulch Loadout (Permit No. C-1992-081) <br /> Proposed Decision <br /> Permit Revision Application No. 2 (PR-2) <br /> <br /> <br />Dear Ms. Kawcak: <br /> <br />Enclosed you will find the Division of Reclamation, Mining and Safety's Proposed Decision Package <br />for Permit Revision No. 2 at the Hayden Gulch Loadout. Notice of the proposed decision will be <br />published in the Colorado Mountain News Media -Steamboat Pilot as soon as possible. The thirty <br />(30) day public comment period for the Division's decision will begin on the day following the first <br />publication. <br /> <br />Documentation must be submitted to the Division demonstrating that a copy of the approved revision <br />application was sent to the Office of Surface Mining and the Bureau of Land Management. The <br />material should be sent within 15 days of final approval. <br /> <br />Please be advised that federal mine plan approval may need to be obtained from the Office of Surface <br />Mining Reclamation and Enforcement (OSM). OSM approval, in addition to State permit approval, <br />is required, before operations affecting federal coal may commence. <br /> <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount <br />of Bond Held equals or exceeds the Revised Liability, you need not submit additional bond. <br />However, if the Revised Liability exceeds the Bond Held, please submit additional bond or rider to <br />your existing bond that equals or exceeds the Revised Liability. This Permit Revision must not be <br />implemented until this proposed decision becomes final and until any required increase in bond is <br />submitted to and approved by the Division. <br /> <br />If there are stipulations attached, please sign and return the proposed decision form to the Division.
The URL can be used to link to this page
Your browser does not support the video tag.