Laserfiche WebLink
<br /> <br />1313 Sherman St. Room 215 Denver, CO 80203 P (303) 866-3567 F (303) 832-8106 https://drms.colorado.gov <br />Jared Polis, Governor | Dan Gibbs, Executive Director | Virginia Brannon, Director <br />1313 Sherman St. Room 215 <br />Denver, CO 80203 <br />November 23, 2021 <br /> <br />Miranda Kawcak <br />Hayden Gulch Terminal, LLC <br /> <br />P.O. Box 670 <br />Hayden, CO 81639 <br /> <br /> <br />Re: Hayden Gulch Loadout (Permit No. C-1992-081) <br /> Proposed Decision <br /> Permit Revision Application No. 2 (PR-2) <br /> <br /> <br />Dear Ms. Kawcak: <br /> <br />Enclosed you will find the Division of Reclamation, Mining and Safety's Proposed Decision Package <br />for Permit Revision No. 2 at the Hayden Gulch Loadout. Notice of the proposed decision will be <br />published in the Colorado Mountain News Media -Steamboat Pilot as soon as possible. The thirty <br />(30) day public comment period for the Division's decision will begin on the day following the first <br />publication. <br /> <br />Documentation must be submitted to the Division demonstrating that a copy of the approved revision <br />application was sent to the Office of Surface Mining and the Bureau of Land Management. The <br />material should be sent within 15 days of final approval. <br /> <br />Please be advised that federal mine plan approval may need to be obtained from the Office of Surface <br />Mining Reclamation and Enforcement (OSM). OSM approval, in addition to State permit approval, <br />is required, before operations affecting federal coal may commence. <br /> <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount <br />of Bond Held equals or exceeds the Revised Liability, you need not submit additional bond. <br />However, if the Revised Liability exceeds the Bond Held, please submit additional bond or rider to <br />your existing bond that equals or exceeds the Revised Liability. This Permit Revision must not be <br />implemented until this proposed decision becomes final and until any required increase in bond is <br />submitted to and approved by the Division. <br /> <br />If there are stipulations attached, please sign and return the proposed decision form to the Division.