Laserfiche WebLink
<br /> <br />NOTICE OF PROPOSED DECISION <br /> <br /> <br />The Colorado Division of Reclamation, Mining and Safety proposes to approve Permit Revision <br />Application No. 2, submitted by Hayden Gulch Terminal, LLC for a coal mining permit at the Hayden <br />Gulch Loadout (Permit No. C-1992-081). PR2 proposes to modify the approved reclamation plan <br />and postmining land use for the major portion of the Hayden Gulch Loadout, consistent with the <br />transfer of former rail spur areas to the Town of Hayden (Hayden) for recreational use. The former <br />rail spur area will be converted to a recreational trail for the use of residents and visitors to Hayden <br />under a locally managed “Tracks-to-Trails” program. <br /> <br />The Hayden Gulch Loadout is a/an loadout operation located in Routt County, approximately 2 miles <br />Southeast of Hayden, Colorado. Coal interest is federal, state and private, and the surface to be <br />affected is state and private land. The permit area encompasses approximately 391.20 acres. <br /> <br />This proposed decision is based on a finding that the proposed operation will comply with all <br />requirements of the Colorado Surface Coal Mining Reclamation Act, Section 34-33-101, et seq., <br />C.R.S., and the regulations promulgated thereunder. <br /> <br />Copies of the proposed decision, including any stipulations, are on file for public inspection at the <br />Hayden Public Library, 201 E. Jefferson Avenue, Hayden, CO 81639. The revision application <br />and proposed decision documents, as well as all other permit documents, can be viewed at <br />https://dnrweblink.state.co.us/drms/search.aspx by searching C1992081 in the “Permit No” field. <br />A user guide is available to help first time users of the imaged document system and can be viewed <br />at https://drive.google.com/file/d/1l8OUdf_Mpjo3kxIHkP5hMH-w7MeBtxX7/view.Persons with <br />an interest that may be adversely affected by the proposed decision may request a formal hearing <br />before the Mined Land Reclamation Board on the proposed decision. Such request must be made <br />within thirty (30) days of the date following initial publication of this notice, must be in writing, and <br />must state with reasonable specificity the reasons for the request and the objections to the proposed <br />decision. <br /> <br />