Laserfiche WebLink
E. Other Disturbances (please describe) <br /> None <br /> F. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to <br /> store. <br /> Drilling muds, hole abandonment material (bentonite and cement) and loss circulation <br /> matedals. No diesel will be stuied un-site, <br /> it will be hanspoited ftom Canon City III d <br /> CDOT certified vehicle and will remain in that vehicle and pumped into the drill rig as <br /> required. There will be small quantities of drilling and engine oil, grease and other fluids <br /> I ised to m2ent2in onsite equipment as needed; they will be stored appropriately ansite <br /> G. New Roads: <br /> Length (ft): 3000 Width (ft): 12 <br /> Significantly <br /> Upgraded Roads Length (ft): Width (ft): <br /> Are culverts or other crossings proposed? If so,please describe: <br /> No. unlikely to be necessary. Some already in place on private and public access roads <br /> H. Total project area to be disturbed (acres) 4.68 acres (if all holes drilled) <br /> I. Describe the equipment to be used for the prospecting operations: <br /> Surface air/mud rotary drill rig and/or diamond core drill rig as well as ancillary air <br /> drill,L;U1IIPIUbzSU1(s), watei huck, pipe truck, backhoe, giader, bulldozer, trackhoe , seed <br /> pick-up truck(s), light plant(s), small generator(s), haul truck for delivering / removing <br /> off-road equipment <br /> Form 2—Public File Page 7 of 14 <br />