Laserfiche WebLink
EXHIBIT G WATER INFORMATION <br /> Mining activity is complete onsite. All water handling that remains is only associated with <br /> remaining reclamation activity. <br /> All water handling activities at Newby Aggregate Recycling will be in accordance with the rules <br /> and regulations of the Colorado Department of Public Health and Environment Water Quality <br /> Control Division. This includes the use of sumps, berms, and other mechanisms to prevent an <br /> offsite discharge. As necessary, the operator will obtain stormwater or process water discharge <br /> permits from CDPHE, although that is not anticipated to be necessary at this time. The enclosed <br /> nature of the operations area will prevent a discharge of water during operations. Collections <br /> ditches will run around the floor of each activity area to drain water to appropriate sumps. <br /> No ground water will be exposed at the facility; therefore, no Substitute Water Supply Plan or <br /> Augmentation Plan will be required to compensate for evaporative losses from ground water <br /> ponds. <br /> Carol Ann Pit G_1 ® Lewicki&Associates <br /> November 2021 <br />