My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-11-15_PERMIT FILE - M2021066
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021066
>
2021-11-15_PERMIT FILE - M2021066
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2025 8:42:44 AM
Creation date
11/16/2021 10:34:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021066
IBM Index Class Name
PERMIT FILE
Doc Date
11/15/2021
Doc Name
Application
From
Holsinger Law, LLC
To
DRMS
Email Name
TNL
JDM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-5- <br /> Responsibilities as a Permitter: <br /> Upon application approval and pennit issuance,this application becomes a legally binding document Therefore.there area member of <br /> rinponant requirements%%hicll y on,as a permittce,should full} understand. These requirements are listed below Please read and initial <br /> cach_requlrcmmit. in the space proNided, to acknowledge that you understand your obligations If you do not understand these <br /> Obligations then please contact this Office fora full explanation <br /> 1. Your obligation to reclaim the site is not limited to the amount of the financial Warranh. You assume legal liability <br /> for all reasonable expenses Which the Board or the Office may incur to reclaim the affected lands associated With your <br /> mining operation in the event your pcmut is revoked and financial Warranty is forfeited. <br /> 2 The Board may suspend or revoke(his permit,or assess a civil penalty.upon a finding that the permittee s jolated the <br /> terms or conditions of this pemiit, the Act, the Mineral Rules and Regulations,or that information contaninetf in the <br /> application or)our permit misrepresent important material facts; <br /> If your mining and reclamation operations affect areas beyond the boundaries of an approved pennit boundary. <br /> substantial civil penalties.to y on as permjttee can result, <br /> 4. Am modification to the approved mining and reclamation plan from those described in y our approved application <br /> requires you to submit a permit modification aril obtain approval from the Board or Office, <br /> 5_ It is y our responsibility to notify the Office of any changes in y our address or phone number, <br /> G Upon permit issuance and prior to beginning on-site mining activity.you must post a sign at the entrance of the mtnc <br /> site.Which skill be clearly visible from the access road,with the following information(Rule 3.1.12y <br /> a the name of the operator. <br /> b a statement that a reclamation permit for the operation has been issued by the Colorado Mined Land <br /> Reclamation Board,and. <br /> c the permit number. <br /> 7. The boundaries of the permit boundary arcs must be marked by monuments or other markers that arc clearly visible <br /> and adequate to delineate such boundaries prior to site disturbance; <br /> I l R, It is a provision of this permit that the operations Will be conducted in accordance with the terms and conditions listed <br /> in%our application,as Well as with the provisions of the Act and the Mineral Rules and Regulations in effect at the timie the <br /> permit is issued. <br /> %t 9. Annually,on the anniversary date of permit issuance,you must submit an annual fee as specified by Statute,aril an <br /> annual report which includes a map descnbing the acreage affected and the acreage rechurned to date(if there are changes <br /> from the previous year),any monitoring required by the Reclamation Plan to be submitted annnially on the anniversin date <br /> of the permit approval. Annual fees are for the previous year a permit is held. For example.a permit W ith the annwersan <br /> efiile of July 1, 1995,the annual fee is for the period of July 1, 1994 through June 30, 1995 Failure to submit s our annual <br /> fee and report by the permit anniversary date may result in a civil penalty,revocation of your permit,and forfeiture of%our <br /> financial warranty. it is your responsibility.as the per ittee,to continue to pay your annual fee to the Office unit the <br /> jBoard releases y on from y our total reclamation responsibility <br /> 10 For joint venture/Vinnership pemiittec.the signing representati%a is authori/.ed to sign W lien docuniciu and a pcm er <br /> i of attorcy (provided by the partner(s))authori/ing the signature of the representative is attached to this application <br /> i <br /> d <br /> d <br /> r <br /> 7 <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.