My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-11-03_REVISION - M1973021
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1973021
>
2021-11-03_REVISION - M1973021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2021 11:17:23 AM
Creation date
11/5/2021 9:52:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973021
IBM Index Class Name
Revision
Doc Date
11/3/2021
Doc Name
Adequacy Review Response #3
From
Aggregate Industries
To
DRMS
Type & Sequence
AM7
Email Name
MAC
ECS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aggregate Industries, Morrison Quarry <br /> Amendment No.7 to Permit M-1973-021 FYZ <br /> Morrison,CO <br /> outlet. All drainage diversion structures were sized based on calculated 100-year peak flow <br /> rates and runoff volumes to limit impacts to downstream structures in UD#2. Both detention <br /> basins will include emergency spillways, designed to accommodate 500-year peak flow with <br /> 50% grate blockage. Detention Basin 2, the inlet basin, will be installed at approximate El. 7,040 <br /> on the northern side of the South Quarry western face to intercept UD#1 along its natural flow <br /> path. Water will pass through the outlet control structure to a culvert to be installed on the <br /> existing upper western bench at El. 7,040, with a slope of 0.2% carrying water south along the <br /> bench towards UD#2. Once the culvert exits the western face bench, the slope will increase to <br /> 1.1% and pass through a control structure to enter Detention Basin #2. From there, water will <br /> discharge to UD#2. The drainage diversion will remain after mining activities are complete. The <br /> draft final drainage design can be found in Appendix 3, and Exhibit F.3 presents its final <br /> configuration. <br /> It is anticipated that stormwater may collect in the lower elevations of the South Quarry after <br /> significant weather events. Per the Storm Water Management Plan (Rev. 6, June 2021), visual <br /> observation will be conducted during and after storm events, and stormwater that has not <br /> infiltrated into the subsurface within 72 hours will be pumped to Outfall 003 for discharge. Once <br /> Phase III mining is completed, a long-term drainage structure will be designed and installed. <br /> The final design and cost estimate for this structure or a permit modification to remove this <br /> drainage requirement will be submitted within 24 months of this amendment signature. <br /> Schedule for Phase III Buildout <br /> Phase III development is anticipated to have a duration of approximately 12 years. The West <br /> Quarry will be mined concurrently with the South Quarry, and approximately 11 acres of the <br /> West Quarry and 86 acres of the South Quarry will be impacted during Phase III. <br /> October 2021 1 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.