Aggregate Industries, Morrison Quarry <br /> Amendment No.7 to Permit M-1973-021 FN <br /> Morrison,CO <br /> Instead, mining will continue at the 40-foot highwall configuration with a minimum 40-foot bench <br /> configuration. <br /> Phase III Quarry Development Narrative <br /> Mining and reclamation will proceed from the present configuration (Exhibit C.2), using the <br /> same mining methods described in AM05. One modification to mining methods is the use of a <br /> portable crushing plant, referred to as the Road Base Processing Plant, located on the northern <br /> end of the South Quarry, to process rock for use in road development and reclamation activities. <br /> This plant will be removed and used at other sites when it is no longer needed (refer to <br /> Exhibit C.2 for its current location). <br /> The sequence of mining activities remains unchanged from AM05, which described mining as <br /> generally occurring on two "fronts" simultaneously: one continues South Quarry development, <br /> and one develops the West Quarry. Exhibit D.2 presents the Phase III buildout configuration <br /> plan view and Exhibit D.2a through Exhibit D.2c present the Phase III buildout configuration <br /> cross sections. The mining plan assumes a bottom elevation of El. 6,505; these numbers reflect <br /> planned benching in this area and average groundwater well water levels surrounding the South <br /> Quarry. The configuration reflects currently mined bench configurations and the maximum <br /> bench configurations identified in the previous section for areas where future mining will occur. <br /> Of note, the bench configurations identify some exceptions to the maximum configurations to tie <br /> future mining benches into completed benches in the South Quarry. <br /> Any changes in the identified bench configurations identified in this Mining Plan will be <br /> documented via the technical revision process for purposes of documenting other than minor <br /> effects upon the approved Reclamation Plan. <br /> West Quarry Haul Road <br /> Construction of the West Quarry Haul Road, a structure necessary to re-establish access to the <br /> upper benches of the South Quarry and commence West Quarry development, is underway and <br /> is scheduled for completion in late fall 2021. The Haul Road plans were summarized in <br /> Technical Review (TR07) and approved in July 2020. TR07 included the haul road design <br /> specifications and proposed configuration, but recognized that the final road alignment was <br /> pending and would be finalized in conjunction with AM07. Since the start of construction, fill <br /> material limitations have resulted in a change to the road alignment to maximize the use of cut <br /> material. Appendix 2 presents the final West Quarry Haul Road design, and Exhibit D.1 <br /> presents the final West Quarry Haul Road configuration. As mining and reclamation continues in <br /> the South and West Quarries, the haul road will be removed and reclaimed as benches <br /> progress eastward. <br /> South Quarry Development <br /> The South Quarry will be developed to a maximum depth before groundwater is encountered. <br /> Groundwater monitoring wells located north, south, and east of the South Quarry (MW2019-03, <br /> MW2019-02, and MW2019-01) show average water level elevations of 6,495, 6,581 and 6,459 <br /> feet, respectively. Based on these water levels, it is assumed that South Quarry base elevations <br /> October 2021 1 18 <br />