My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1973021 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1973021
>
_REVISION - M1973021 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2021 9:04:39 AM
Creation date
11/5/2021 8:51:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973021
IBM Index Class Name
Revision
Doc Name Note
AM07 Final
Doc Name
Adequacy Review Response #3
From
Aggregate Industries
To
DRMS
Type & Sequence
AM7
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aggregate Industries, Morrison Quarry <br />Amendment No. 7 to Permit M-1973-021 <br />Morrison, CO <br /> <br />October 2021 | 36 <br />including BMPs and dust suppression of working areas during working and non-working <br />periods, including weekends, throughout the duration of the project. <br />Item 4.0 Site Survey <br />This task consists of performing all surveys, measurements, and computations required by the <br />specifications to accurately track that the materials are imported and exported according to the <br />design drawings. <br />Item 5.0 Dewatering <br />To handle stormwater accumulations within the West and South Quarries (below El. 7,000 on <br />the western wall), a horizontal drain will be installed running from the sump location of the South <br />Quarry eastward and daylighting in Unnamed Drainage #3. Dewatering would consist of <br />installing a borehole approximately 700 feet under the eastern wall of the South Quarry. The <br />remainder of the hole would be unlined and drilled at a sufficient diameter capable of handling <br />stormwater flows of a 10-year precipitation event. <br />It is assumed the outlet would be a free-flowing pipe, but if necessary, a wellhead complete with <br />valve control and pressure gauge could be installed to regulate flows from the base of the South <br />Quarry during heavy precipitation events. <br />Item 6.0 Structure Dismantling and Demolition <br />All human-made structures not shown in Exhibit F.1 through Exhibit F.3 will be dismantled, <br />demolished and removed from the site prior to final grading and reclamation. These include, but <br />are not limited to, the following structures: <br />• Processing Area Equipment (conveyors, crushers, etc.) <br />• Mine Administration Offices <br />• Road Base Processing Plant in South Quarry <br />• Fuel Storage Area <br />• Haul Roads and Parking Areas <br />• Truck Wash and Tarping Area on Main Access Road <br />• Dewatering Wells, Communication Towers, and Other Utilities <br />The operator will dismantle, demolish, and/or remove from the property all structures listed <br />above and any additional structures not shown in Exhibit F.1 through Exhibit F.3. All structures <br />must be removed in accordance with the reclamation plans. Concrete foundations and slabs <br />must be removed unless authorized to remain as per the end user request. No debris or re- <br />saleable materials will be permitted to be left on site following final grading. No pipes, rebar, or <br />any other materials are to be left protruding from the ground. Prior to demolition and removal, <br />the physical condition of the property will be evaluated, and features such as hazardous <br />substances and/or petroleum product containers, storage tanks, odors, pools of liquid, drums,
The URL can be used to link to this page
Your browser does not support the video tag.