My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1973021 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1973021
>
_REVISION - M1973021 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2021 9:04:39 AM
Creation date
11/5/2021 8:51:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973021
IBM Index Class Name
Revision
Doc Name Note
AM07 Final
Doc Name
Adequacy Review Response #3
From
Aggregate Industries
To
DRMS
Type & Sequence
AM7
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aggregate Industries, Morrison Quarry <br />Amendment No. 7 to Permit M-1973-021 <br />Morrison, CO <br /> <br />October 2021 | 33 <br />Testing for in-place density and moisture content will be performed in accordance with ASTM D <br />6938. Testing will be performed by the operator (or their subcontractor) on a frequency of one <br />test for each lift of fill placed. <br />Rough grading in un-mined areas shown in Exhibit F.1 through Exhibit F.3, such as the <br />processing plant and haul roads, will be sufficiently ripped down to 18 inches, re-graded, and <br />scarified prior to topsoil placement and revegetation. A D-5 up to a D-9-sized bulldozer with <br />rippers will be used for all site grading. <br />Structure Removal <br />Permanent structures to remain on site following reclamation will include stormwater drainage <br />infrastructure, perimeter barbed-wire fencing, maintenance access roads, a holding tank east of <br />Reservoir Site II, and a utility shed south of Reservoir Site II. These features are shown on <br />Exhibit F.1 through Exhibit F.3. The holding tank and utility shed are considered necessary for <br />post-mining use and continued maintenance of Reservoir Site II by the Town of Morrison. <br />All other structures not shown in Exhibit F.1 through Exhibit F.3 will be dismantled and removed <br />from the site prior to final grading and reclamation. These include, but are not limited to, the <br />following structures: <br />• Main Processing Area Equipment (conveyors, crushers, etc.) <br />• Mine Administration Offices <br />• Road Base Processing Plant in South Quarry <br />• Fuel Storage Area in Central Quarry <br />• Haul Roads and Parking Areas <br />• Truck Wash and Tarping Area on Main Access Road <br />• Dewatering Wells, Communication Towers, and Other Site Utilities <br />Areas where these structures are constructed will be cleared of debris following dismantling. <br />Debris will be sent to a licensed landfill facility for disposal. Each area will then be graded to <br />surrounding topography and revegetated according to the requirements of the section titled <br />Revegetation. Exhibit L – Reclamation Costs provides costs for dismantling and demolishing <br />structures. <br />Revegetation <br />Revegetation will be performed approximately on a yearly basis, preferably in late fall <br />(November), for any area that has been backfilled, graded, and shaped. Typical acreage having <br />undergone hydroseeding in a given year is between 1 and 5 acres, based on work completed to <br />date. This may include acreage that has previously been seeded, but which has required <br />overseeding for continued maintenance. <br />Seeding with a native grass seed mix will be performed by the hydroseeding method. This <br />method allows for seeding on fairly steep slopes; provides complete coverage; and combines
The URL can be used to link to this page
Your browser does not support the video tag.