across the property so they will be mined and reclaimed in two phases. The first will be the southern <br /> area where the current disturbance is. Mining will proceed through the berm separating the Spring <br /> Creek Pit and the neighboring gravel pit. The second phase will be the mining of the currently <br /> undisturbed area in the northwest. Map C-2 shows the mining extents and general locations of the <br /> previously mined area and the area to be mined. <br /> Mining within the pit will use a 1 H:1 V to a near vertical slope on active mining faces until reaching <br /> the final mining extents to maximize gravel recovery within the mine. Immediately after the highwall <br /> reaches the outer mining extents, slopes will be backfilled to a 2H:1V final mining slopes. They will <br /> be further backfilled during reclamation to a 3H:1 V reclaimed slope. These slopes can be visualized <br /> in Map C-3. No more than 500 feet of active mining highwall will exist at any time without being <br /> backfilled and regraded to reclamation slopes. <br /> Reclamation will be completed concurrently with the progression of mining. Areas where mining has <br /> been completed will be reclaimed to minimize the ongoing disturbance area. Highwalls will be <br /> backfilled to a 3H:1V slope which can be seen in Map F-1. It is anticipated that there will be enough <br /> overburden to supply the required backfill amount to regrade each slope. Some areas of the mine <br /> have already been reclaimed, specifically along the south and western portions of the pit. <br /> The total disturbed area with this expansion will be 87 acres. Following the completion of phase 1 <br /> mining in the southern area of the pit, a total of 62 acres will be disturbed. Approximately 11 acres <br /> of this phase have been partially reclaimed as of 2021 including backfill, grading, and topsoiling. <br /> This area is shown in Map C-2. The remaining 51 acres that are not partially reclaimed will need to <br /> be retopsoiled. Nearing the end of phase 1 mining, phase 2 will commence in the northwestern <br /> portion of the pit. This adds approximately 25 acres to the disturbance area. All 25 acres will be <br /> topsoiled, seeded, and mulched. Prior to opening phase 2 for mining, additional bond will be posted <br /> as described in Exhibit L. <br /> No more than 500 feet of mining highwall will remain without being backfilled and regraded to <br /> reclamation slopes at any given time. <br /> 2. Mining Timetable <br /> Mining operations at the Spring Creek Mine will take at least 5 years to complete, based on an <br /> annual production of 150,000 to 375,000 tons per year(260,000 tons per year average). This is an <br /> estimate with the life of the mine will varying based on market conditions. Table D-1 - Mining <br /> Timetable shows the mining sequence and the amount of time for each step. <br /> Spring Creek Pit <br /> September 2021 D-2 Lewicki&Associates <br />