My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-11-02_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2021-11-02_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2021 11:19:16 AM
Creation date
11/3/2021 11:51:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
11/2/2021
Doc Name
Adequacy Review #2
From
DRMS
To
New Elk Coal Company, LLC
Type & Sequence
PR5
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRUCK/LOADER TEAM WORK <br /> Task description: Strip and Place 5 acres of topsoil RDA <br /> Site: New Elk Mine Permit Action: PR5 Permit/Job#: C1981012 <br /> PROJECT IDENTIFICATION <br /> Task#: 019 State: Colorado Abbreviation: None <br /> Date: 10/26/2021 County: Las Animas Filename: PR5 <br /> User: ME <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Equipment Description <br /> Truck Loader Team-Truck: Cat 725 <br /> -Loader: Cat 319D L 8'-10"Stick <br /> Support Equipment-Load Area: Cat D7R DS Series II LGP <br /> -Dump Area: Cat D7R DS Series II LGP <br /> Road Maintenance Motor Grader: CAT 14M <br /> -Water Truck: Water Tanker,3,500 Gal. <br /> Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Excavator Load Area Dump Area Motor Water Truck <br /> Grader <br /> %Utilization-machine: 100 100 50 50 25 25 <br /> Ownership cost/hour: $72.63 $52.19 $81.02 $81.02 $85.80 $17.15 <br /> Operating cost/hour: $49.40 $43.34 $39.67 $39.67 $15.10 $7.30 <br /> %Utilization-riper: NA 0 NA NA NA NA <br /> Ripper own. NA $0.00 $0.00 $0.00 $0.00 $0.00 <br /> cost/hour: <br /> Ripper op.cost/hour: NA $0.00 $0.00 $0.00 $0.00 $0.00 <br /> Operator cost/hour: $32.54 $37.32 $41.30 $41.30 $28.56 $0.00 <br /> Unit Subtotals: $154.57 $132.85 $161.99 $161.99 $129.46 $24.45 <br /> Number of Units: 1 1 1 1 1 1 <br /> Group Subtotals: Work: $287.42 Support: $323.98 Maint: $153.91 <br /> Total work team cost/hour: $765.31 <br /> MATERIAL QUANTITIES <br /> Initial volume: 9,274 CCY Swell factor: 1.000 <br /> Loose volume: 9,274 LCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety <br /> Source of estimated swell factor: Cat Handbook <br /> Material Purchase Cost: $0.00 <br /> Total Cost: $0.00 <br /> HOURLY PRODUCTION <br /> Truck Capacity <br /> Truck Payload(weight)Basis: <br /> Material weight: 1,600 Pounds/LCY <br /> Description: Top Soil <br /> Rated Payload: 52,000 Pounds <br />
The URL can be used to link to this page
Your browser does not support the video tag.