Laserfiche WebLink
BULLDOZER WORK <br /> Task description: Regrade Areas from MR-99,MR-107,MR-111,MR-114 <br /> Site: New Elk Mine Permit Action: PR5PR5 Permit/Job#: C1981012 <br /> PROJECT IDENTIFICATION <br /> Task#: 012 State: Colorado Abbreviation: None <br /> Date: 10/26/2021 County: Las Animas Filename: PR5 <br /> User: ME <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D9T-9SU <br /> Horsepower: 405 <br /> Blade Type: Semi-Universal <br /> Attachment: NA <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $126.01 NA <br /> Operating Cost/Hour: $141.41 100 <br /> Ripper own. $0.00 NA <br /> Cost/Hour: <br /> Ripper op.Cost/Hour: $0.00 0 <br /> Operator Cost/Hour: $41.30 NA <br /> Total unit Cost/Hour: $308.72 <br /> Total Fleet Cost/Hour: $926.17 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 5,536 <br /> Swell factor: 1.125 <br /> Loose volume: 6,228 LCY <br /> Source of estimated volume: Exhibit 28-p.232 assume 4""topsoil materiar, <br /> Source of estimated swell Operator Estimate <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 60 feet <br /> Unadjusted hourly 1,872.0 LCY/hr <br /> production: <br /> Materials consistency Loose stockpile 1.2 <br /> description: <br /> Average push 0% <br /> gradient: <br /> Average site altitude: 7,400 feet <br /> Material weight: 2,132 lbs/LCY <br /> Weight description: User Provided <br />