My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-11-01_HYDROLOGY - M2016030
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2016030
>
2021-11-01_HYDROLOGY - M2016030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2021 7:09:59 AM
Creation date
11/2/2021 6:54:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016030
IBM Index Class Name
Hydrology
Doc Date
11/1/2021
Doc Name
Substitute Water Supply Plan
From
Wenli Dickinson - Water Resources
To
DRMS
Email Name
PSH
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Valley's Edge Resource Substitute Water Supply Plan <br />November 1, 2021 <br />Page 3 of 7 <br />least 48 hours prior to making replacement deliveries at a location other than the Hite Treatment <br />Facility; in the instance of an intervening call the Applicant will not be allowed to make <br />replacements downstream of the calling right. <br />The Hite Treatment Facility is located approximately 22 miles upstream of the Pit. The delivery <br />schedule includes a transit loss of 0.5% per mile (11% for 22 miles) during the months of April through <br />October and 0.25% per mile (5.5% for 22 miles) during the months of November through March. <br />Conveyance loss for delivery of augmentation water to the South Platte River is subject to <br />assessment and modification as determined by the Division Engineer. <br />Conditions of Approval <br />I hereby approve the proposed SWSP in accordance with section 37-90-137(11), C.R.S. subject to <br />the following conditions: <br />1. This SWSP is approved with the effective date of November 1, 2021 through October 31, <br />2022, unless otherwise revoked or superseded by decree. If this plan is not decreed in water <br />court by the SWSP expiration date, a renewal request must be submitted to this office with <br />the statutory fee of $257 no later than August 1, 2021. <br />2. Well Permit 82057-F has been issued for this pit, and this permit remains valid. The permit <br />covers up to 30 acres of exposed surface area and allows for annual water uses of up to <br />118.23 acre-feet for evaporation losses, water lost with the mined product, and dust control. <br />Actual depletions cannot exceed these amounts and are limited to those uses specifically <br />approved through this SWSP. <br />3. The total surface area of the groundwater exposed at the Valley's Edge Resource Gravel Mine <br />must not exceed 17.0 acres during this plan period, which results in a maximum evaporative <br />loss of 49.85 acre-feet. <br />4. The annual water used for dust control at the Valley's Edge Resource Gravel Mine shall not <br />exceed 6.72 acre-feet for this SWSP approval period. <br />5. Total consumption at the Valley's Edge Resources Gravel Mine must not exceed these <br />aforementioned amounts unless an amendment is made to this SWSP. <br />6. Approval of this SWSP is for the purposes as stated herein. This office must first approve any <br />additional uses for the water. <br />7. The replacement water that is the subject of this SWSP cannot be sold or leased to any other <br />entity. As a condition of subsequent renewals of this SWSP, the replacement water must be <br />appurtenant to this site until a plan for augmentation is obtained. All replacement water <br />must be concurrent with depletions in quantity, timing, and locations. <br />8. The downstream substitute supplies can be used when a continuous live surface stream flow <br />exists between the confluence of St. Vrain River and the South Platte River and the point of <br />discharge of the replacement water, and there is no intervening, calling water right. <br />9. Adequate accounting of depletions and replacements must be provided to the Division <br />Engineer in Greeley (Div1Accountinq@state.co.us), the Water Commissioner (Jorge Vidal at <br />Jorge.Vida[@state.co.us) and the River Operations St Compact Coordinator (Brent Schantz, <br />at Brent. Schantz@state.co.us) on a monthly basis. All amounts shall be in acre-feet. All <br />
The URL can be used to link to this page
Your browser does not support the video tag.