Laserfiche WebLink
EXHIBIT F — Reclamation Plan Maps and Cross-Sections <br /> INDEX <br /> SHEET F-1: (2436) Entire site showing <br /> 1. Reclamation sequence and areas by year.(1"=400', 1:4800) <br /> 2. Final reclamation contours(1 0-footcontour interval, 1"=400' (1:4800) <br /> 3. Cross-sections on satellite oblique photos before and after mining and reclamation <br /> 4. Detail of edge of affected area(profile)showing typical swale/berm <br /> Notes: <br /> 1. Assuming Phases 1 and 2 are complete—does not show Phases 3 and 4 due to uncertainty as to depth of <br /> deposit being mined in these areas. May require a technical amendment or more detailed information <br /> submitted with annual reports after Phases 1 and 2. <br /> 2. Years shown for reclamation assume a two to three year lag from original disturbance(stripping and <br /> excavation)for areas used strictly for mining,and variable delay for areas used for plant siting. <br /> 3. Cross-sections show existing(pre-mining), maximum mining,and post-reclamation profile from West to East <br /> for Oakbrush Hill(2 lines)and Northwest to Southeast for North Oakbrush Hill,as shown in oblique photos. <br /> Assumes uniform depth of deposit being mined;differences in depth may change final profile but there will <br /> be no ponding. <br /> 4. Contour interval of less than 10 feet(for example, County standard of 2 feet)make drawing difficult to read, <br /> so County has(tentatively)approved 10-foot intervals. <br /> 5. Final slope approximates the original slope, essentially 20 feet lower in elevation, but will be smoother than <br /> original terrain, and will lengthen most slopes which were naturally 2H:1V or steeper. Some portions of <br /> reclamation will result in flatter areas with somewhat steeper slopes around them to accommodate ranching <br /> operations after mining. <br /> C&J Gravel Products, Inc. Page 26 of 93 20 OCT 2021 <br /> Application for Permit: Oakbrush Hill Gravel M-2021- C&J-DPR-V5-001 <br />